Hyderabad: Minister Komatireddy Venkat Reddy laid the foundation stone for Nalgonda bridge road works worth ₹9.40 crore in the Municipal Corporation’s 3rd Division.
The project included the construction of a high-level bridge along with road works. It would provide a link from ST Colony to Addanki Road through Sheshamma Gudem. The government earmarked ₹9.40 crore for the infrastructure project.
Nalgonda bridge road works connect ST Colony
The Nalgonda road works covered the route beginning at ST Colony in the city’s 3rd Division. From there, the proposed road would pass through Sheshamma Gudem before connecting with Addanki Road.
Komatireddy formally launched the project by laying its foundation stone. The high-level bridge and accompanying road formed part of the ₹9.40-crore project planned within the Nalgonda Municipal Corporation limits.